SDIA Terminal 2 Parking Plaza

PLANETBIDS REGISTRATION/SWINERTON PREQUALIFICATION/RFQ RESPONSE
Refer to the Opportunities tab

DIR REGISTRATION
All contractors must be registered with the Department of Industrial Relations (DIR) in order to bid on public works projects. Registration fee is $300 annually. For more information, visit the DIR website: http://www.dir.ca.gov/Public-Works/Contractors.html

TEXTURA BILLING 
All
billing will be submitted through Textura, a web based invoicing and payment solution. Subs can electronically sign and submit their pay application and payments are made electronically. Please note the fees associated with Textura – 0.18% of contract value, minimum $50-maximum $2,500. Sub-tier subcontractors $100.

OWNER CONTROLLED INSURANCE PROGRAM (OCIP)
This project is under an Owner Controlled Insurance Program (OCIP). Contractor’s prompt submittal of OCIP enrollment documents, certificates of insurance and other required documents/information is essential and must be completed within 10 days of Notice of Award.

PUBLIC WORKS 
This is a public works job and therefore, must comply with State of California Labor Law Requirements including but not limited to: payment of prevailing wage rates, use of apprentices, certified payroll reporting, payment of training fund contributions, listing of all subcontractors, nondiscrimination, workers compensation insurance and OSHA.


CERTIFIED PAYROLL REPORTING
This project requires the use of LCP Tracker for all certified payroll reporting. Hardcopies will not be accepted. Additionally, subcontractors must upload certified payroll to the DIR’s electronic certified payroll reporting (eCPR) system.

SAFETY TRAINING
All Contractors/Subcontractors are required to attend a safety training prior to the commencement of work. In addition, subcontractors must show a 10-hour or 30-hour OSHA Construction card at time of orientation (minimum 20% of work force must hold at least a 10-hour OSHA card). All other staff must have their 10-hour OSHA Construction card within 120 days of starting work on this project. Any Field Supervisors must have completed a 30-hour OSHA within the past 3 years prior to beginning work on the project and be a certified trainer in construction.

DRUG TESTING
This project requires the following be submitted within 10 days of Notice of Award: Drug and Alcohol Abuse Prevention Program (digital & hard copy), evidence of having passed a 5-panel Non-DOT drug screen with a negative result within the past 90 days for each employee who will be working on site.